Skip to content

Industries

Food and Beverage Plant Procurement, KSA

From coffee chains to petrochemical plants, buyers and suppliers in fifteen industries run purchasing, deliveries and field assets on ENTEK. Pick yours.

15industries on ENTEK

Pick your industry

Industry 04 / 15 · Food and hospitality

Food and beverage manufacturing

From the bottling line to the loading dock, one record.

Bottling, water and dairy producers buy industrial inputs at volume and ship product every day. ENTEK runs the buying side and the field side together.

What teams run on ENTEK

  • Multi-round bidsSuppliers bid across rounds, and the award issues the PO in one step.
  • Fleet in viewVehicle status, load weight and driver fuel receipts on one live map.
  • Scope 2 per plantOperations audit tracks consumption, cost and Scope 2 per branch, with the method shown.

Solutions used

CorporateSupplierIoTEnergy

ENTEK.AI helps bottling, water and dairy producers in Saudi Arabia run the buying side and the field side in one record. Plants buy industrial inputs at volume through multi-round bids with 320+ verified suppliers, delivery vehicles show status, load weight and fuel receipts on a live map, and each plant gets consumption, cost and Scope 2 with the method shown.

How do we run bids over several rounds for bulk inputs?

Pick items from the catalogue so each line carries its full product details, and set delivery preferences per item so every supplier prices the same thing. Each bid line can carry 1 to 5 delivery options. You approve, decline or counter each round, and both sides keep the full history. Amounts stay in each bid's currency, with no conversion. Accepting the winning bid creates the purchase order in one step.

How do we follow vehicles that leave the plant?

Fleet in ENTEK IoT places every vehicle on a live map with its status. Track one vehicle and its map refreshes every 5 seconds with speed and GPS position. Each vehicle holds up to 7 days of route history, plus speed, fuel and load weight. Drivers photograph fuel receipts, which are read automatically. You approve or reject each one with litres, SAR and station, and that decision is final.

How do we get Scope 2 for each plant?

For each plant, give one of three things: monthly consumption in kWh, the monthly bill in SAR, or the electricity account number. Scope 2 is grid use minus your renewable share, multiplied by 0.499 kg CO2e per kWh (ECRA, 2023), shown as plus or minus 10% with the method beside it. A plant with no data stays out of totals, never counted as zero. Scope 1 and 3 go into ESG.

TaskModuleWhat you get
Find inputs and check suppliersSourcingMarketplace in 12 top-level categories, compare up to 3 products, a supplier badge based on documents
Bring the suppliers you already useSourcingInvite one by one or by bulk upload, then buy from them or send them RFQs
Buy at volume in roundsProcurement1 to 5 delivery options per bid line, counter each round, purchase order issued on award
Follow delivery vehiclesIoT & OT (Fleet)Live map, route up to 7 days, load weight history, fuel receipts approved or rejected
Scope 2 per plantOperations auditConsumption, electricity cost and Scope 2 per branch, factor and source printed
Report packsESGGRI, TCFD and CDP packs with Scope 2, consumption and renewable share, as PDF